Build the switch

From REV-A on the bench to a unit you can hold.

The full engineering disclosure for the Mk.II REV-B severance interlock: how the boards are split, how the PCB is laid out, every component and what it costs, the ten-stage build, the test plan each unit must pass, and how that adds up to the finished price.

REV-B

Production revision taken from the REV-A bench rig

4 boards

Severance, authority, custody and supply, all separable

6 layers

Mixed power/signal stack-up, 2 oz outer copper

4U

Production chassis the REV-B boards are designed into

Architecture

Four boards, because the cut must not depend on the clever one.

The authority and severance boards contain no processor in the decision path. The custody board watches and signs but cannot command. Separating them is the whole safety argument — a compromised controller still cannot cut, and still cannot hide a cut.

A

Authority board (no microcontroller in the cut path)

Two certified key barrels drive dual redundant SPDT switches into a hardwired AND gate built from a relay-logic pair. The arming timer is a discrete 555-class monostable with an 8 s window. Nothing on this board can be commanded over a bus — the cut decision is metal and logic, not firmware.

B

Severance board (four latched channels)

Channel 1: 2-pole 40 A AC-3 contactor with arc chutes for mains. Channel 2: fibre/SFP bypass relay that opens the uplink. Channel 3: NVMe and weight-store power rail via back-to-back MOSFET solid-state switch. Channel 4: BMC/IPMI out-of-band isolator. Each channel latches open mechanically and reports its real contact state back, not its commanded state.

C

Custody board (signed, append-only)

A secure element with an internal monotonic counter signs every cover lift, key turn, arm, cut, verify and restore. An RTC with its own cell stamps each entry. Logs go to onboard flash and out through a read-only optically isolated UART — the host has no write path to this board.

D

Supply and hold-up board

Dual 100–240 V AC inputs with ORing, an isolated flyback front end, and a supercapacitor plus LiFePO4 pack that holds the interlock alive through a total mains loss so the cut still completes and still gets signed.

PCB design

Layout zones and stack-up.

Mains switching stays left of the barrier, authority and custody stay right of it, and the only thing crossing is reinforced isolation. The barrier is a routed slot, not a keep-out note someone can overrule in layout review.

Board layout — severance assembly

Mains severanceK1 contactor · arc chutesChannel switchingK2 · K3 · Q1–Q4Sense + verifyR1–R4 Kelvin shuntsIsolated telemetryU1–U4 · read-only outAuthoritySW1/SW2 · AND gateCustodyU20 secure elementISOLATION BARRIER · 8 mm CREEPAGE

Stack-up — 6 layer

L1 — TopSignal + component side, 2 oz copper, controlled-impedance sense traces
L2 — GNDSolid chassis-referenced ground plane, no splits under the isolation barrier
L3 — PowerSplit planes: 24 V coil, 12 V logic, 5 V secure element
L4 — IsolatedSecondary-side plane for the custody and telemetry domain
L5 — GNDSecond ground plane, return path for the contactor drive
L6 — BottomHeavy-current pours, 4 oz on the severance board, screw-terminal side

Layout rules that are not negotiable

  • —8 mm creepage and 5 mm clearance across the mains-to-logic isolation barrier, with a routed slot under the optocouplers.
  • —Contactor coil drive kept in its own return loop; flyback diode within 5 mm of the coil terminals.
  • —The key-switch AND gate is routed as a hard-wired series path — there is no test point, no jumper and no firmware bypass across it.
  • —Secure element sits inside a tamper mesh pour tied to the cover switch; lifting the lid without clearing the seal trips it.
  • —Current-sense shunts on every channel are Kelvin-connected so verification reads real load, not driver state.
  • —All four channels report contact position from an auxiliary contact set, never from the drive signal.

Enclosure

The 4U chassis the boards live in.

The enclosure is part of the safety case, not packaging. It separates mains from logic, carries arc energy away, and makes an undocumented opening visible.

Form factor

19-inch 4U rack chassis, 482 × 177 × 450 mm, 1.5 mm cold-rolled steel, powder coated graphite. Wall variant MK2-W uses the same boards in a 600 × 400 × 250 mm steel wall box.

Compartments

Three internal bays: mains severance (rear, behind an earthed steel barrier), authority and custody logic (front), and supply with hold-up cell (side). No mains conductor crosses the logic bay.

Front panel

Hinged polycarbonate cover over the lever, two key barrels, amber/cyan state lamps, frangible tamper seal and a cover switch logged to the ledger. IP31 front, IP20 rear.

Arc and heat

Arc chutes vent through a baffled rear grille away from operators. Passive cooling only — no fans, so no fan failure mode and no airflow path into the logic bay.

Cable entry

Rear gland plate with separated entries for mains, fibre and management. Fibre shear module mounts on its own tray. All entries sealed and labelled per channel.

Security fixings

Tamper-resistant fasteners, lockable to the cabinet rail, chassis-open switch independent of the cover switch. Seals are serialised to the unit's build record.

Component list

Every part, what it does, what it costs.

Quantities are per unit. Unit costs are volume-tier estimates, not signed supplier quotes — the tier table on the manufacturing page sets the run sizes these assume.

Severance board

$306 per unit

RefPartQtyUnitLine
K1

2-pole contactor, 40 A AC-3, 24 V DC coil

Arc chutes, auxiliary contact block for position read-back

1$96$96
K2

Fibre / SFP bypass relay, latching

Opens the uplink and stays open without holding current

1$34$34
Q1–Q4

Back-to-back MOSFET pair, 100 V 120 A

Solid-state severance of the NVMe / weight-store rail

4$11$44
K3

BMC / IPMI isolation relay, 2-form-C

Out-of-band management severance channel

1$18$18
R1–R4

Kelvin current-sense shunt, 0.5 mΩ, 3 W

Per-channel verified-dead-load measurement

4$6$24
U1–U4

Isolated current-sense amplifier

Reinforced isolation across the mains barrier

4$7$28
PCB-S

6-layer PCB, 2 oz outer / 4 oz bottom, 233 × 180 mm

ENIG finish, IPC Class 3, slotted isolation barrier

1$62$62

Authority board

$467 per unit

RefPartQtyUnitLine
SW1, SW2

Certified key barrel, dual-detent, registered blanks

Two independent barrels, keys registered to named holders

2$148$296
K10, K11

Safety relay, force-guided contacts

Hardwired AND gate — both keys or no travel

2$29$58
U10

Precision monostable timer

8 s arming window, relocks automatically

1$3$3
SW3

Lever actuator with mechanical interlock plate

Cannot travel unless both barrels are turned

1$74$74
SW4

Cover / tamper switch, frangible seal kit

Logged independently of the key path

1$12$12
PCB-A

4-layer PCB, 160 × 120 mm

Relay-logic authority board, no MCU in the cut path

1$24$24

Custody board

$96 per unit

RefPartQtyUnitLine
U20

Secure element, monotonic counter, ECDSA P-256

Signs every custody entry; host has no write path

1$9$9
U21

Application MCU (telemetry and display only)

Reads state, drives the panel — cannot command a cut

1$8$8
U22

RTC with backup cell

Timestamps that survive a power loss

1$4$4
U23

Onboard log flash, 256 Mb, append-only partition

Local custody record

1$5$5
U24–U27

Digital isolator, reinforced

Read-only outbound UART to the operator network

4$3$12
DSP1

Front panel display and status ring

Per-channel live / severed / out-of-scope indication

1$27$27
PCB-C

6-layer PCB with tamper mesh pour, 140 × 100 mm

Mesh tied to the cover switch

1$31$31

Supply and hold-up board

$197 per unit

RefPartQtyUnitLine
PS1, PS2

Isolated flyback module, 100–240 V AC to 24 V, 60 W

Dual feed with ORing diodes

2$38$76
BT1

LiFePO4 pack, 12.8 V 3 Ah, with protection board

Completes and signs the cut through total mains loss

1$46$46
C1–C6

Supercapacitor, 10 F 2.7 V, balanced stack

Rides out the contactor inrush during severance

6$5$30
F1–F4

Fuse holder and HRC fuse set

Per-channel protection, front-serviceable

4$4$16
PCB-P

4-layer PCB, 4 oz, 200 × 120 mm

Heavy-current supply board

1$29$29

Chassis and wiring

$359 per unit

RefPartQtyUnitLine
ENC1

4U 19-inch steel chassis, powder coated, IP31 front

Lockable to the cabinet rail, tamper-evident lid

1$214$214
TB1

Screw terminal block set, 40 A rated

Field wiring for all four channels

1$38$38
WH1

Internal wiring harness, pre-crimped and labelled

Mains, coil, sense and isolated telemetry looms

1$57$57
MISC

Fasteners, standoffs, busbar, thermal pads, gaskets

Mechanical build kit

1$41$41
LBL1

Rating plate, serial label and seal set

Serialised per unit, tied to the custody record

1$9$9

Total bill of materials, per unit

$1,425

Build guide

Ten stages, in this order, every time.

The order matters. Low-voltage and custody provisioning happen before the board ever meets mains, and nothing gets sealed until the load tests and the signed log both pass.

01

Fabricate and verify the boards

Order the four boards to IPC Class 3 with electrical test on every net. Before any parts go on, check the isolation slot is routed and measure barrier creepage on a bare board. A board that fails here never gets populated.

02

Populate low-voltage first

Reflow the custody and authority boards, then hand-fit the key barrels and connectors. Power the custody board on the bench, provision the secure element, burn in its key pair and record the public key against the unit serial before it ever meets mains.

03

Build the supply board and prove hold-up

Populate the flybacks, cap stack and pack. Load it to the contactor's worst-case inrush, pull mains and confirm the rail holds long enough to complete and sign a cut. This is the step that turns 'it usually works' into 'it works when the building goes dark'.

04

Populate the severance board and torque the power path

Fit the contactor, relays, MOSFET pairs, shunts and terminal block. Torque every power connection to spec with a calibrated driver and paint-mark it, so a loose joint is visible at the next inspection instead of found in an incident.

05

Wire the mechanical AND gate

Land the two key barrels into the force-guided relay pair and the lever interlock plate. Verify by hand that one key alone produces no lever travel and no coil drive. There is deliberately no jumper, no test mode and no service bypass across this path.

06

Assemble into the 4U chassis

Mount the four boards on standoffs with the barrier between mains and telemetry domains kept physically clear. Dress the harness so mains and isolated looms never share a bundle. Fit the cover switch, frangible seal and rating plate.

07

Electrical safety test

Insulation resistance, dielectric withstand across the barrier, protective earth bond, and creepage inspection against IEC 60947 practice. Record the readings against the serial number. A unit with no recorded readings does not leave the bench.

08

Functional severance test under load

Run each channel under rated load: arm, cut, and confirm verified dead load on the Kelvin shunts within the latency budget. Then confirm the refusals — one key does nothing, arming an empty scope is rejected, the lever relocks after eight seconds.

09

Custody and restore verification

Pull the signed log and confirm every cover lift, key turn, arm, cut, verify and restore appears with a monotonic counter value. Then run the staged restore with inrush limiting, channel by channel, with supervisor confirmation on each.

10

Burn-in, seal and factory acceptance

Fifty loaded cut cycles, thermal soak at the temperature extremes, then reseal, serialise and run the witnessed factory acceptance test. The acceptance pack ships with the unit and is the first entry in its life record.

Test plan

What every unit has to pass before it is a unit.

Each result is recorded against the serial number and ships with the unit as its acceptance pack. Readings, not ticks.

Dielectric withstandBarrier tested at type-test voltage, per unit, reading recorded
Insulation resistanceMeasured mains-to-logic and mains-to-chassis, logged to the serial
Earth bondProtective earth continuity to every exposed metal part
Rated break40 A @ 250 V AC per pole, 2-pole, AC-3 duty, under load
Severance latencyArm to verified dead load, measured on the shunts, per channel
Hold-upCut completed and signed during a total mains loss
Interlock refusalsOne key, empty scope and expired arming window all rejected
Custody integritySigned, gap-free log with a monotonic counter across the whole test
Burn-in50 loaded cut cycles with contact erosion measured before and after
ThermalFull function at -10 °C and 55 °C after soak

Finished unit pricing

What it costs to build, and why it lists where it does.

Below is the build cost of one finished, tested, sealed MK2-R against its list price. The gap covers engineering, the installation and rehearsal programme behind every unit, support across the warranty term, and the margin that keeps the line running.

Bill of materialsAll four boards, chassis and wiring, at volume pricing$1,425
Assembly and wiring labourBoard population, chassis build, harness dressing$1,150
Test, burn-in and calibrationSafety test, 50-cycle burn-in, thermal soak, shunt calibration$780
Certification amortised per unitThird-party electrical safety certification, spread across the build run$1,400
Key registration and custody provisioningRegistered blanks, secure element provisioning, serial binding$260
Warranty and spares reserve3-year parts and labour, 10-year severance-core guarantee$890
Total cost of a finished, tested unit$5,905

Sentinel Mk.II MK2-R

$18,400

List price per unit, before installation and commissioning.

Build cost
$5,905
Gross contribution
$12,495
Gross margin
68%

Partner pricing

Certified partners order off the same line at 15–32% off list depending on tier, with minimum order quantities per build slot. The tiers, lead times and terms are on the manufacturing page.

Partner build line →

Straight answers

What this disclosure is and is not.

01

This is a REV-B design, not a shipped product

REV-A exists on the bench and has taken 4,200 loaded cut cycles. REV-B is the production design derived from it, moving to the 4U chassis. No REV-B unit has been through third-party certification yet, so nothing here is a certified product claim.

02

Costs are engineering estimates

Component costs are volume-tier estimates at the quantities in the tier table, not signed supplier quotes. Labour and test figures come from timing the REV-A build and its test campaign. Expect movement on contactors, key barrels and enclosure as the run size settles.

03

Do not build this from the page

This is a design and cost disclosure for buyers, partners and reviewers — it is not a DIY kit. The unit switches mains at 40 A. Building, installing or commissioning one is licensed electrical work, and a unit without the recorded safety tests above has no evidentiary value.

Next

Run the interlock, then read the specs.

The prototype page has the live demo and the measured REV-A bench results. The hardware page has the full unit specifications and the order form.